Links are being "fixed"
Pictorial (from the CAD drawings)
Below is a representation of the main components and the sequence of assembly.
Click on the the "pics" to go to their respective construction details and current rate of completion.
The renderings below are not to the same scale for clarity
8 Hull segments |
2 needed |
2 - one without stairs |
Cabin and Bridge |
under construction |
Rear Transom |
The "twin" bulkhead structure |
|
under construction
|
return to: THIS IS IT |